Warning: Use of undefined constant referer - assumed 'referer' (this will throw an Error in a future version of PHP) in /usr/home/essaywo/public_html/essays on line 102

Warning: Use of undefined constant host - assumed 'host' (this will throw an Error in a future version of PHP) in /usr/home/essaywo/public_html/essays on line 105

Warning: Cannot modify header information - headers already sent by (output started at /usr/home/essaywo/public_html/essays:102) in /usr/home/essaywo/public_html/essays on line 106

Warning: Cannot modify header information - headers already sent by (output started at /usr/home/essaywo/public_html/essays:102) in /usr/home/essaywo/public_html/essays on line 109
Hospitable Framwork - College Essay

Hospitable Framwork


Ohio's Flexicore Building Systems make short work of hotel construction
When an amusement park operator decided to construct a new hotel to meet increased business, it faced challenges ranging from winter month delivery to a site with limited access. The solution came from Dayton, Ohio-based Flexicore Systems, Inc., a company specializing in precast hollow core products.
"The most challenging aspect of constructing the Breakers Tower entailed location and time constraints," says Cedar Point's Monty Jasper, vice president of maintenance and new construction. "The site is difficult to access and we stipulated that construction would be during the offseason-October through May."
Located on ...

Want to read the rest of this paper?
Join Essayworld today to view this entire essay
and over 50,000 other term papers

company currently has three hotels on or very near the park property, but there is still a need for more.
In 1997, architects began designing the Breakers Tower, a 10-level structure nesfled between the original Hotel Breakers, constructed in 1905, and Bon Air, a wing of the hotel that was added in 1924. The Breakers Tower was designed to replace an older wing of the hotel encompassing 170,000 sq. ft. of space that includes 230 guest rooms, a IG.I.Friday's Restaurant, pool, and other amenities.
Since work on the new property would disrupt traffic and access to the amusement park, an overriding requirement was that the construction methods and material chosen allow the fastest possible installation without sacrificing quality. Work on the project was limited to the months when the park was closed.
After reviewing a number of alternatives, project designers and engineers from Cedar Point selected the Dyna-Frame Structural Precast Frame System and Flexicore Decks manufactured by ...

Get instant access to over 50,000 essays.
Write better papers. Get better grades.


Already a member? Login


CITE THIS PAGE:

Hospitable Framwork. (2007, May 15). Retrieved May 4, 2024, from http://www.essayworld.com/essays/Hospitable-Framwork/64899
"Hospitable Framwork." Essayworld.com. Essayworld.com, 15 May. 2007. Web. 4 May. 2024. <http://www.essayworld.com/essays/Hospitable-Framwork/64899>
"Hospitable Framwork." Essayworld.com. May 15, 2007. Accessed May 4, 2024. http://www.essayworld.com/essays/Hospitable-Framwork/64899.
"Hospitable Framwork." Essayworld.com. May 15, 2007. Accessed May 4, 2024. http://www.essayworld.com/essays/Hospitable-Framwork/64899.
JOIN NOW
Join today and get instant access to this and 50,000+ other essays


PAPER DETAILS
Added: 5/15/2007 08:19:33 AM
Category: Miscellaneous
Type: Free Paper
Words: 912
Pages: 4

Save | Report

SHARE THIS PAPER

SAVED ESSAYS
Save and find your favorite essays easier

SIMILAR ESSAYS
» Shampoo Planets - Book Report
» Congresswoman Rep. Maxine Wate
» Tourism Importance
» Attention Deficit Hyperactivity...
» The Maltese Falcon
» Discussion Of The Feasibility O...
» High School Vs. College
» Society 2
» Muhammad Ali - Cassius Clay
» Ernest Hemingway: His Life And ...
Copyright | Cancel | Contact Us

Copyright © 2024 Essayworld. All rights reserved